Project Overview
Location
Düzce Province
-
Estimated Annual Emission Reductions
75382
-
Project Status
- ACTIVE
-
VCS Project Type
Energy industries (renewable/non-renewable sources)
-
Project Registration Date
12/02/2021
About The Project
-
The purpose of the proposed project activity is to generate renewable electricity to be delivered to the Turkish National Power Grid by utilizing water resources. The project activity is located at the Golyaka Town, Duuzce Province, Turkey. The total installed capacity of the Project is 46.2 MW. The electricity is going to be produced without causing airborne pollutants or Green House Gas (GHG) emissions. The construction and operation of the Duzce Aksu Hydro Electric Power Plant (HEPP) will be delaying the addition of conventional thermal power plants to the Turkish National Electricity Grid.